top of page
Systèmes
Étanchéité Auxiliaires & Vaisseaux sous pression
Std & API 682

NEED OF INFORMATION ?

Delta Logo.png
  • Canadian Company

  • Local Manufacturing

  • Fast delivery

  • Strong O&G expertise

  • Innovation

  • Flexibility

  • Private company

  • Strong importance to customer service

  • Ontario, Canada

Plan 21/23

I’m a paragraph. Double click

me or click Edit Text. It's easy  to make it your own.

  • For single joint

  • Plan 21: Cooling version of plan 11

  • Plan 23: closed recirculating cooling system using a pumping ring.

Plan 32

I’m a paragraph. Double click

me or click Edit Text. It's easy  to make it your own.

  • For single joint

  • Product intake via an external source

Plan 41

  • For single joint

  • Combination of plan 21 & plan 31

65A QUICK CLOSURE.JPG

Single Seal

Plan 65A/B

  • For single joint

  • Liquid leak detection plan

In addition to this, you need to know more about it.

Hi Temp Plan 52 with GWR.jpg

Plan 52/53A

  • For double seal

  • Plan 52: Non-Pressurized

  • Plan 53A: Pressurized

  • Fluid barrier to external seal via reservoir

Plan 53B/53C

I’m a paragraph. Double click

me or click Edit Text. It's easy  to make it your own.

  • For double pressurized seal

  • Plan 53B: Plan 53A with an accumulator to isolate the gas from the coolant.

  • Plan 53B: Uses a piston accumulator to pressurize the system

20200115_075418.jpg

Plan 54

  • For double pressurized seal

  • Complex system using a clean external pressurized source

I’m a paragraph. Double click

me or click Edit Text. It's easy  to make it your own.

Plan 74

I’m a paragraph. Double click

me or click Edit Text. It's easy  to make it your own.

  • For dual gas seal

  • Control panel using pressurized gas.

  • Typical gas used: Nitrogen

Plan 72

  • For double gas seal

  • Control panel using pressurized gas

  • Low pressure

  • Typical gas used: Nitrogen

  • Often with Plan 75 or 76

I’m a paragraph. Double click

me or click Edit Text. It's easy  to make it your own.

Hi%20Temp%2075%203_edited.jpg

Plan 75/76

  • For Dual Seal

  • Plan 75: Collection system for product always in liquid phase or which condenses.

  • Plan 76: Non-condensed leak diversion system to the vapor recovery system or the flare.

  • Often with Plan 72

I’m a paragraph. Double click

me or click Edit Text. It's easy  to make it your own.

CONTACTEZ-NOUS

1833 rue Langevin, Chambly, Québec, J3L 2E6

ppouliot@bep.services  |  Tel: +1 (514)889-6896

  • LinkedIn - White Circle

Merci pour votre envoi !

bottom of page